OASIS is a modern office complex located in the area of La Florida Business Park, a privileged location of great business prestige in the surroundings of El Plantio and Monte de El Pardo. It has a facade with a front of 60 linear meters to the A-6 that give it great visibility given the great road traffic of the highway.
Completely renovated in 2021, the renovation of OASIS has given it a modern and original style that makes it stand out notably in its surroundings. In this project, the facades of the building have been adapted, the roofs have been refurbished, the finishes of the halls and toilets, and the conditioning of the garden areas.
The complex has a gross leasable area of 10,463 m2 above ground distributed in two buildings, A and B, which are accessed from a central courtyard with pleasant garden areas and carefully lit. With regard to parking, it has a wide range of spaces, 408 in total distributed both on the surface and below ground. It also has private charging points for electric cars and parking for bikes.
The OASIS offices are open, bright and equipped with technical floors, adjustable false ceilings, perimeter radiators, air conditioning by 4-tube system and recessed LED lighting with light sensors and CTE control. There are also toilets adapted for people with reduced mobility.
In addition, the complex has 6 elevator cores, centralized fire detection system and 24-hour security with security camera system in entrances, lobbies and perimeter. To complete the offer of services, OASIS has a concierge service, parcel service, maintenance staff and a cafeteria/restaurant on the ground floor of the same.
Regarding the environment, there is a wide range of services such as the Hipercor de Pozuelo, the Sexta Avenida Shopping Center, the AC Marriott Aravaca hotel and the Sanitas La Zarzuela and Vithas Aravaca hospitals.
Finally, OASIS has excellent communications. On the one hand, it has immediate access to the A-6 and M-40 motorway and, on the other hand, it is worth noting the construction of a pedestrian walkway from the other side of the highway to facilitate communication with the Renfe El Barrial-Centro Comercial Pozuelo stop, which will have direct access from the same complex. It is estimated that this construction will be completed by approximately August 2022.